First 100 manufacturers earn the Genesis Rank Badge
Are you with Guangzhou Prima Technology?
Guangzhou Prima Technology
Heavy-duty robotic palletizing machines for automated bulk goods handling
Guangzhou Prima Technology Co., Ltd. manufactures collaborative palletizing robots under the IPS brand, including the PM-CP50 (50kg payload), PM-CP20 (20kg payload), and related cobot palletizers for carton stacking and industrial automation. Products are designed for labor-intensive warehouse and manufacturing operations, with 24/7 operation capability and customizable grippers and vision systems. The company has been active on Alibaba for 13+ years as a multispecialty supplier based in Guangdong, China.
Active products
6
Price range
$7.8K – $12.8K
6 of 6 priced
Top-rated product
78.8
/100
Pm-Cp20 Cobot Palletizer
Company facts
- Legal name
- Guangzhou Prima Technology Co., Ltd.
- HQ
- Guangzhou, China
Active products by Guangzhou Prima Technology
6 shown| # | Category | Key specs | ||||
|---|---|---|---|---|---|---|
| 1 | ![]() | Pm-Cp20 Cobot Palletizer | Cobot | Payload 25 kg·Reach 1.6 m | $9.1K | 78.8 |
| 2 | ![]() | Pm-Cp50 Cobot Palletizer | Cobot | Payload 1995.8 kg·Reach 2 m | $12.8K | 76.6 |
| 3 | PM-CP20 | Industrial Arm | Repeatability ±0.05 mm·DOF 7 DOF | $7.8K | 35.8 | |
| 4 | PM-CP30 | Industrial Arm | Repeatability ±0.05 mm·DOF 7 DOF | $9.6K | 35.8 | |
| 5 | PM-CP50 | Industrial Arm | Repeatability ±0.05 mm·DOF 7 DOF | $12.8K | 35.8 | |
| 6 | Pm-Cp30 Cobot Palletizer | Cobot | Repeatability ±0.05 mm·DOF 7 DOF | $8.9K | 32.9 |
Collaborative Robot buying guides
Industry Knowledge →
Cobot Vendor Red Flags: Questions That Filter Out the Marketing
A structured set of questions for cobot vendor evaluations — covering cycle-time validation, reference site access, software update policies, EOAT ecosystem dep…

Running a Cobot Pilot in a Manual Production Line
A structured 90-day cobot pilot in a manual line requires baseline measurement before day one, a named owner, cycle-time validation before PO signature, and wri…

Use Cases Where Cobots Fail: High-Payload, High-Speed, and Dirty Environments
Three categories of production environment actively defeat cobot economics: high-speed cycle-time applications, payloads above 20 kg, and environments with chip…

